This project was a 20,000 sq. ft. health care facility with dialysis center. JEL’s responsibilities were all the Civil Engineering design including site layout and design of the sewer/water systems which includes an on-site sewage treatment facility consisting of a secondary treatment media filter bed with subsurface effluent injection. JEL also designed the utilities, roadways, and parking lots including design of roadway access to a NMDOT controlled road. JEL performed the construction administration on this project as well. $7 million
Project is a 14,000 sq. ft. facility for preschool children and after school programs for elementary students. The facility consisted of classrooms, play and athletic spaces, both interior and exterior. JEL’s Civil Engineering design responsibilities included site layout and design of the sewer/water systems which included an on-site sewage treatment facility consisting of a secondary treatment media filter bed with subsurface effluent injection. JEL also designed the utilities, roadways, and parking lots including design of roadway access to a NMDOT controlled road. JEL performed the construction administration on this project as well. $7.4 million